Vоdovod Tirz Prilep

Construction of a water supply system with the necessary hydraulic facilities

This facility includes the construction of an external water supply system consisting of: pumping station, pressure pipeline, water tanks with a capacity of 1100 m3 electricity and automation.

Information

  • Client: Tirz Prilep
  • Date of performance: 21.05.2020
  • Category: Completed projects
© 2021 Стентон Градба. All Rights Reserved.
web by kara5.