Reconstruction and extension of the Bridge over the city river on st. Trajko Nikoloski for the needs of the Municipality of Prilep

Drilling of | 78 AB piles with a length of 13,00m and a diameter of 800 mm, their reinforcement and concreting. 4 overhead beams, 4 AB canvases, 4 cast beams, 126 AB bridge girders and AB slab with d = 20cm have been installed. Appropriate drainage and installation of waterproofing on the bridge and its asphalting has been performed.

The bridge is 24 meters long and 22 meters wide. There are 4 lanes, each - 3.5 meters wide. On both sides there are walking trails - 2.5 meters wide and bicycle lanes - 1.5 meters each.

Information

  • Client: Municipality of Prilep
  • Date of performance: 09.05.2019
  • Category: Completed projects