"MAKEDONSKA FALANGA" Street

This project envisages a complete reconstruction of the existing road construction and the sidewalks on the south and west sides. Machine cutting, excavation of the existing road construction with a quantity of 1,163.37m3 and removal of the existing stone curbs are foreseen. The reconstruction of the road construction includes arrangement of the bed, construction of drains for drainage of the bed in a length of 532.00m, construction of the upper structure of the street and the pavement with gravel, installation of stone curbs with a length of 763.00m, installation of street gutters, construction of an asphalt layer on a roadway with an area of 2,420.00m2 and construction of granite tile pavements with a total area of 935.00m2. Arrangement of the green areas with a square footage of 323.00m2 is also planned.

Information

  • Client: Municipality of Bitola
  • Date of performance: 16.05.2024
  • Category: Completed projects