"KRUSHEVSKA REPUBLIKA" Street

The "Krushevska Republika" street mainly stretches along a flat and un-built surface in a northwest-southeast direction with a length of 630.45m. It consists of one carriageway with two traffic lanes and sidewalks on both sides. The width of the roadway is 14.00m with a two-sided slope, and the sidewalks are 2.00m wide, and a total area of 2177.17 m2 on which prefabricated paver elements are provided. For the construction of the road, a total excavation of 9,716.8m3 is foreseen. The mattress is made of bonified incoherent material with a maximum presence of small particles of 4,413.12m3. The required amount of crushed stone for the performance of all necessary positions is 12,005.11m3. On a length of 2,406.00 m, prefabricated curbs are installed, and the surface of the asphalt is 8,882,89 m2. For the drainage of the street, it is planned to accept the storm water on the surface with installed street drains, and for the drainage of the bed, drainage of granulated gravel and perforated PVC pipes is planned.

Information

  • Client: Municipality of Bitola
  • Date of performance: 29.07.2022
  • Category: Completed projects
© 2021 Стентон Градба. All Rights Reserved.
web by kara5.