A rehabilitation of an activated landslide with a total length of 25.00m with a construction of a larger cut on the right side of the existing road, with the aim of deviating the road and its construction on stable terrain and construction of an angular AB retaining wall on the left side of the projected road in order to ensure the stability of the road construction was performed. The wall is composed of several campads, the joints of which are made of waterproof expansion joints, and 2 benchmarks are placed on each campad at the crown of the wall. Before the concreting the wall, barricades made of PVC pipes were placed in the intended places, and after the concreting, a drainage system was made to accept and remove the infiltrated underground water. Finally, a new roadway construction with an area of 710.00m2 was constructed.

Information

  • Client: PESR
  • Date of performance: 28.07.2022
  • Category: Completed projects