Cleaning of the riverbed of Crna River - 9 km long. The cleaning of the riverbed enabled the increase of the embankments of the minor and major riverbed with over 100,000.00 m3 as well as excavation/cleaning of alluvial deposit material in a total amount of 180,000.00 m3.