"DOVLEDZIK" Street

This project envisages the reconstruction of the road construction on "Dovledzik" street in the length of 464.95m, i.e. from station 0+034.07 to station 0+498.74m. The geometry of the route is composed of straights and one round curve with radius R=950m. The vertical solution is limited and captured by the existing entrances to the buildings, the connections with the side streets and the vertical condition of the existing roadway. In cross-section, the roadway is designed with a two-sided slope.

 For the construction of the street, first of all, machine cutting of the existing asphalt, breaking and removal of the upper structure, as well as dismantling of existing curbs is necessary. The performance of the necessary positions for the roadway construction, as well as the performance of the drainage, including excavation of a total of 2611.02m3, installation of buffer material 2166.67m3, installation of new curbs in length of 1823m, asphalt with an area of 5245.13m2 and installation of prefabricated paver elements for the sidewalks with an area of 1225.89m2.

Information

  • Client: Municipality of Bitola
  • Date of performance: 28.07.2022
  • Category: Current projects
© 2021 Стентон Градба. All Rights Reserved.
web by kara5.